This sample table gives minimum floor joist sizes for joists spaced at 16 inches and 24 inches on center o c for 2 grade lumber with 10 pounds per square foot of dead load and 40 pounds of live load which is typical of normal residential construction.
Floor joist close to ground.
How do i support them.
First they allow the wood to get wet over and over again as rain drips through the deck boards over the joists and into the drainage system below.
In any area where there is wind simpson ties are important to join the beam to the post and the joists to the beam.
For a simple rectangular ground level deck all you may need to visualize it is to lay out a string line with stakes to get the sense of the size.
Deck joists rotting from the top edge down because the deck boards and debris keep them damp for weeks after rain.
The joists were pressure treated lumber so i was surprised at how badly decayed they were.
Low decks are sometimes a choice and other times a necessity.
Wednesday march 6 2019 the minimum clearance between the ground and the wood structural floor joists and girders is primarily for prevention of wood rot that is caused by wood being too close to the moisture in the soil.
To find the actual distance between the inside edges of each adjacent floor joist subtract 1 inches from either 12 or 24 inches.
What are the best decking fasteners to use.
Should i install a vapor barrier under the deck.
Ground level decks are known to stump.
But my friend wasn t.
But when building a deck that low i d suggest you also consider a patio instead.
In some places the joists will actually touch the soil.
Joist hangers would be fine.
1 the higher up above ground your house is the less ground moisture is a problem though uplift and wind wash become bigger issues.
You can bury concrete post piers to act as your actual piers as well.
I realize that the joists can t just rest on the ground.
He sees it all the time.
With some structures floor joists are required to be 12 or 24 inches apart on center.
Wood joists stay wet when a deck drainage system is installed below the joists.
So he has two rot fighting tips for deck owners and builders.
Builders can adjust their choice of lumber size and spacing depending on circumstances.
I want to build a deck close to the ground.
Under deck drainage systems that are mounted below the joists cause damage in three ways.
The distance between the centers of the tops of two adjacent joists.